Serving Texas, Oklahoma, New Mexico & Louisiana Contactinfo@hfsnow.com972-707-1677
Projects / Industrial / Facility Services

Ongoing Maintenance at a Site That Never Shuts Down

Shades, safety rails, de-icing, VCT, hazard tape, dock shelters and overhead work at a site that never shuts down.

Loading dock shelter replacement: after: same dock finished with a new shelter, seals and bumpers
Featured program · Facility services

Ongoing Maintenance at a Site That Never Shuts Down

Recurring facility work at a site that never shuts down: shades replaced, safety rails repainted, de-icing ahead of winter weather, damaged VCT replaced, hazard tape placed to keep electrical clearances compliant, and dock equipment repaired.

Shades & safety rails

Worn blinds swapped for new roller shades, and dock safety rails repainted safety yellow.

Facility maintenance: exit door and window with worn blinds before replacement
Facility maintenance: Hercules crew member on a ladder removing old window blinds
Facility maintenance: new roller shade installed at the exit window
Loading dock maintenance: Hercules crew painting loading dock safety rails safety yellow
Winter readiness & flooring

Ice melt spread across parking lots and walkways overnight so the operation keeps running through freezing weather, and damaged VCT pulled and replaced.

Winter facility services: pallet of ice melt staged in a Hercules box truck
VCT flooring replacement: Hercules crew removing damaged VCT in an operating lab
VCT flooring installation: new VCT being set over prepared subfloor
Floors, code compliance & turnover

Finished VCT, hazard tape at electrical panels and aisles to keep required clearances marked, and power poles removed after a department relocated.

VCT flooring replacement: finished VCT replacement in front of lab freezers
Facility safety compliance: hazard tape marking the required clearance in front of electrical panels
Facility safety compliance: hazard tape line keeping a lab aisle clear
Department relocation and decommissioning: power poles taken down after a department relocation, with the open floor ready for the next use
Dock shelter replacement

One dock from start to finish. Before: worn, torn shelter. During: old shelter stripped and the new frame set. After: new shelter, seals and bumpers.

Loading dock shelter replacement: before: worn and torn dock shelter ahead of replacement
Loading dock shelter replacement: during: old shelter stripped and Hercules crew setting the new shelter frame
Loading dock shelter replacement: after: same dock finished with a new shelter, seals and bumpers
Overhead & mechanical

Lift work above occupied floors and warehouse aisles, and mechanical units serviced so the building keeps running.

Warehouse facility maintenance: Hercules technician working overhead from a personnel lift in a warehouse
HVAC maintenance: Hercules technicians servicing an air handling unit
Ductwork installation: Hercules technician installing duct work above a ceiling
Facility maintenance and plumbing repair: Hercules technician replacing plumbing at a handwashing sink in a commercial kitchen

Have a project in planning?

Call or email us about the facility, the scope and the schedule. Consultations are complimentary.

Call HFS 972-707-1677