Laboratory Renovation and Equipment Moves
Lab doors reframed, fume hoods and biosafety cabinets relocated with our certification partner, and finance offices refreshed.

Laboratory Renovation and Equipment Moves
Work inside an operating laboratory: walls reframed for new double doors, fume hoods and biosafety cabinets relocated, a department sink remodeled and the finance offices painted.
Wall opened and reframed, then new double doors with vision lites hung and finished.




Units decontaminated by our certification partner, then wrapped, padded and strapped to dollies, moved through the lab, and calibrated and certified at the new location.




Department sink remodeled with a new tile backsplash, and the finance offices painted with furniture protected in place.




Fume Hood, Biosafety Cabinet and Lab Setup
Fume hoods and biosafety cabinets prepped, wrapped and moved through an operating lab, with decon, calibration and certification by our certification partner. At the destination we remodeled the floor and walls, assembled the lab tables and placed the equipment on them.




More Projects

Sterile Processing Equipment Replacement
A hospital sterile processing department upgraded to new STERIS washers and sterilizers in two phases, inside infection control containment.
View project
Hospital Executive Suite Remodel
A hospital C-suite and conference room remodeled under containment, plus a room readied for new GE imaging equipment.
View project
Pallet Racking, Forklifts and Lifts
Pallet racking torn down, relocated and installed with our own forklifts and scissor lifts inside working warehouses.
View projectHave a project in planning?
Call or email us about the facility, the scope and the schedule. Consultations are complimentary.
