Floors in controlled spaces have to seal tight and clean easily. We remove the old flooring to the slab, prep it right and install sheet vinyl with welded seams and flash cove base.
What is included
Homogeneous and heterogeneous sheet vinyl
Heat-welded seams
Integral flash cove base with cap strip
Tear-out to the slab and adhesive removal
Moisture testing, patching and leveling
Seams finished flush and smooth for cleaning
Gowning to facility protocol in clean rooms
Work inside ICRA containment
How it works
Our Process
Remove
Old flooring and adhesive removed under containment.
Prep
Slab tested, patched and leveled.
Install
Sheet laid, seams welded and cove formed.
Hand back
Inspected and ready for terminal cleaning.
Planning a move, remodel or repair? Call or email us to get a walkthrough on the calendar.